Managements Discussion and Analysis CURRENT ISSUES ELECTRIC COMPETITION _WHOLESALE COMPETITION The Energy Policy Act of 1992 and the FERCs subsequent rulemaking activities opened the wholesale energy market to competition. Open-access transmission for wholesale customers, as defined by the FERCs rules, provides energy suppliers, including Duke Energy, with opportunities to sell and deliver capacity and energy at market-based prices. From the FERCs open-access rule, Franchised Electric obtained the rights to sell capacity and energy at market-based rates from its own assets, which allows Franchised Electric to purchase, at attractive rates, a portion of its capacity and energy requirements resulting in lower overall costs to customers. Open access also provides Franchised Electrics existing wholesale customers with competitive opportunities to seek other suppliers for their capacity and energy requirements. In 1999 and 2000, the FERC issued its Order 2000 and Order 2000-A regarding Regional Transmission Organizations (RTOs). These orders set minimum characteristics and functions RTOs must meet, including independent authority to establish the terms and conditions of transmission service over the facilities they control. The orders provide for an open and flexible RTO structure to meet the needs of the market, and for the possibility of incentive ratemaking and other benefits for transmission owners that participate. As a result of these rulemakings, Duke Energy and two other investor-owned utilities, Carolina Power & Light Company and South Carolina Electric & Gas Company, planned to establish GridSouth Transco, LLC (GridSouth), as an RTO responsible for the control of the companies combined transmission systems. In March 2001, GridSouth received provisional approval from the FERC. However, in July 2001, the FERC issued orders recommending that utilities throughout the U.S. combine their transmission systems to create four large independent regional operators, one each in the Northeast, Southeast, Midwest and West. The FERC ordered GridSouth and other utilities in the Southeast to join in 45 days of mediation to negotiate terms of a Southeast RTO. The FERC has not issued an order specifically based on those proceedings. Duke Energy, Carolina Power & Light Company and South Carolina Electric & Gas Company remain committed to the GridSouth RTO, but due to regulatory uncertainties in the RTO arena, the companies have withdrawn their applications to the PSCSC and NCUC to transfer functional control of their electric transmission assets to GridSouth. The companies intend to file new applications before the state commissions in the near future, including a revised GridSouth structure designed to meet the needs of customers and regulators. Also, in January of 2002, GridSouth signed a memorandum of understanding with the representatives of SeTrans Grid Company (SeTrans), a group of investor-owned utilities and public power entities in several southeastern states seeking to form an RTO, to cooperate in discussing potential operational relationships between GridSouth and SeTrans and the structure of wholesale electric markets in the southeast U.S. The actual structure of GridSouth or an alternative combined transmission structure and the date it will become operational depend upon the resolution of all regulatory approvals and technical issues. Management believes that the result of this process, and the establishment and operation of GridSouth or an alternative combined transmission system structure, will have no material adverse effect on Duke Energys future consolidated results of operations, cash flows or financial position. _RETAIL COMPETITION Currently, Franchised Electric operates as a vertically integrated, investor-owned utility with exclusive rights to supply electricity in a franchised service territory a 22,000-square-mile service territory in the Carolinas. In its retail business, the NCUC and the PSCSC regulate Franchised Electrics service and rates. Electric industry restructuring is being addressed throughout the U.S. and will likely impact all entities owning electric generating assets. The NCUC and the PSCSC are studying the merits of restructuring the electric utility industry in the Carolinas. In 1997, North Carolina passed a bill that established a study commission, including legislators, customers, utilities and a member of an environmental group, to examine whether competition should be implemented in the state. In 2000, the study commission unanimously approved a set of recommendations on electric restructuring and submitted a report containing these recommendations to the General Assembly. The report recommended retail deregulation beginning partially in 2005 and fully in 2006. However, events in Californias power market have led the study commission to evaluate whether, and to what extent, proposed legislation should be introduced. In general, the commission has expressed interest in ensuring that a viable wholesale electric market is in place prior to opening the states retail electric market. Currently, the electric utility industry is predominantly regulated on a basis designed to recover the cost of providing electric power to customers. If cost-based regulation were to be discontinued in the industry for any reason, including competitive pressure on the cost-based prices of electricity, profits could be reduced and electric utilities might be required to reduce their asset balances to reflect a market basis less than cost. Discontinuance of cost-based regulation would also require affected utilities to write off their associated regulatory assets. Duke Energys regulatory assets are included in the Consolidated Balance Sheets. The portion of these regulatory assets related to Franchised Electric is approximately $1.0 billion, including primarily purchased capacity costs, deferred debt expense and deferred taxes related to regulatory assets. Duke Energy is recovering substantially all of these regulatory assets through its current wholesale and retail electric rates and may attempt to continue to recover these assets during a transition to competition. In addition, Duke Energy would seek to recover the costs of its electric generating facilities in excess of the market price of power at the time of transition. Duke Energy supports a properly managed and orderly transition to competitive generation and retail services in the electric industry. However, transforming the current regulated industry into efficient, competitive generation and retail electric markets is a complex undertaking, which will require a carefully considered transition to a restructured electric industry. The key to effective retail competition is fairness among customers, service providers and investors. Duke Energy intends to continue to work with customers, legislators and regulators to address all the important issues. Management currently cannot predict the impact, if any, of these competitive forces on future consolidated results of operations, cash flows or financial position. NATURAL GAS COMPETITION _WHOLESALE COMPETITION In 2000, the FERC issued Order 637, which sets forth revisions to its regulations governing short-term natural gas transportation services and policies governing the regulation of interstate natural gas pipelines. Short-term has been defined as all transactions of less than one year. Among the significant actions taken are the lifting of the price cap for short-term capacity release by pipeline customers for an experimental 2 1/2-year period ending September 1, 2002, and requiring interstate pipelines to file pro forma tariff sheets to (i) provide for nomination equality between capacity release and primary pipeline capacity; (ii) implement imbalance management services (for which interstate pipelines may charge fees) while at the same time reducing the use of operational flow orders and penalties; and (iii) provide segmentation rights if operationally feasible. Order 637 also narrows the right of first refusal to remove economic biases perceived in the current rule. Order 637 imposes significant new reporting requirements for interstate pipelines that were implemented by Duke Energy during 2000. Additionally, Order 637 permits pipelines to propose peak/off-peak rates and term-differentiated rates, and encourages pipelines to propose experimental capacity auctions. By Order 637-A, issued in 2000, the FERC generally denied requests for rehearing and several parties, including Duke Energy, have filed appeals in the District of Columbia Court of Appeals seeking court review of various aspects of the Order. During the third quarter of 2001, Duke Energys interstate pipelines submitted revised pro forma tariff sheets to update the filings originally submitted in 2000. These filings are currently subject to review and approval by the FERC. Management believes that the effects of these matters will have no material adverse effect on Duke Energys future consolidated results of operations, cash flows or financial position. _RETAIL COMPETITION Changes in regulation to allow retail competition could affect Duke Energys natural gas transportation contracts with local natural gas distribution companies. While natural gas retail deregulation is in the very early stages of development, management believes the effects of this matter will have no material adverse effect on Duke Energys future consolidated results of operations, cash flows or financial position. NUCLEAR DECOMMISSIONING COSTS Estimated site-specific nuclear decommissioning costs, including the cost of decommissioning plant components not subject to radioactive contamination, total approximately $1.9 billion stated in 1999 dollars based on decommissioning studies completed in 1999 (studies are completed every five years). Duke Energy contributes to an external decommissioning trust fund and maintains an internal reserve to fund these costs. The balance of the external funds was $716 million as of December 31, 2001 and $717 million as of December 31, 2000, and is reflected in the Consolidated Balance Sheets as Nuclear Decommissioning Trust Funds (asset) and Nuclear Decommissioning Costs Externally Funded (liability). The balance of the internal reserve was $239 million as of December 31, 2001 and $231 million as of December 31, 2000, and is reflected in the Consolidated Balance Sheets as Accumulated Depreciation and Amortization. Both the NCUC and the PSCSC have granted Duke Energy recovery of estimated decommissioning costs through retail rates over the expected remaining service periods of its nuclear plants. Management believes that the decommissioning costs being recovered through rates, when coupled with expected fund earnings, are sufficient to provide for the cost of decommissioning. Additionally, management believes that funding of the decommissioning costs will not have a material adverse effect on consolidated results of operations, cash flows or financial position. (See Note 11 to the Consolidated Financial Statements.) The external decommissioning trust fund is invested primarily in domestic and international equity securities, fixed-rate, fixed-income securities and cash and cash equivalents. Duke Energy has an agreement with the NRC that these funds will only be used for activities relating to nuclear decommissioning. These investments are exposed to price fluctuations in equity markets and changes in interest rates. Because the accounting for nuclear decommissioning recognizes that costs are recovered through Franchised Electrics rates, fluctuations in equity prices or interest rates do not affect consolidated results of operations, cash flows or financial position. NUCLEAR RELICENSING In 2000, the NRC renewed the operating license for Duke Energys three Oconee nuclear units through 2033 to 2034. Applications to renew the operating licenses for Duke Energys Catawba and McGuire nuclear units were filed with the NRC in June 2001. These operating licenses currently expire between 2021 and 2026. ENVIRONMENTAL Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. _MANUFACTURED GAS PLANTS AND SUPERFUND SITES Duke Energy operated manufactured gas plants until the early 1950s and has entered into a cooperative effort with the State of North Carolina and other owners of former manufactured gas plant sites to investigate and, where necessary, remediate those contaminated sites. Regulators consider Duke Energy to be a potentially responsible party, possibly subject to future liability at six federal and two state Superfund sites. While remediation costs may be substantial, Duke Energy will share in any liability associated with contamination at these sites with other potentially responsible parties. Management believes that resolution of these matters will have no material adverse effect on consolidated results of operations, cash flows or financial position. _PCB (POLYCHLORINATED BIPHENYL) ASSESSMENT AND CLEANUP PROGRAMS In 2001, Texas Eastern Transmission, LP, a wholly owned subsidiary of Duke Energy, completed the remaining requirements of a 1989 U.S. Consent Decree regarding the cleanup of PCB-contaminated sites. The Environmental Protection Agency (EPA) certified the completion of all work under the Consent Decree in January 2002. Monitoring of groundwater and remediation at certain sites may continue as required by various state authorities. In March 1999, Duke Energy sold PEPL and Trunkline to CMS. (See Note 1 to the Consolidated Financial Statements for more information on the sale of the pipelines.) Under the terms of the sales agreement with CMS, Duke Energy is obligated to complete cleanup of previously identified contamination resulting from the past use of PCB-containing lubricants and other discontinued practices at certain sites on the PEPL and Trunkline systems. Based on Duke Energys experience to date and costs incurred for cleanup, management believes the resolution of matters relating to the environmental issues discussed above will have no material adverse effect on consolidated results of operations, cash flows or financial position. _AIR QUALITY CONTROL In 1998, the EPA issued a final rule on regional ozone control that required 22 eastern states and the District of Columbia to revise their State Implementation Plans (SIPs) to significantly reduce emissions of nitrogen oxide by May 1, 2003. The EPA rule was challenged in court by various states, industry and other interests, including Duke Energy and the states of North Carolina and South Carolina. In 2000, the court upheld most aspects of the EPA rule. The same court subsequently extended the compliance deadline for implementation of emission reductions to May 31, 2004. In 2000, the EPA finalized another ozone-related rule under Section 126 of the Clean Air Act (CAA). Section 126 of the CAA has virtually identical emission control requirements as the 1998 action, and specified a May 1, 2003 compliance date. While the emission reduction requirements of the rule have been upheld in court, the implementation date for the rule has been revised to May 2004 as a result of a legal challenge and the resulting court order. Management estimates that Duke Energy will spend from $500 million to $900 million in capital costs for additional emission controls through 2007 to comply with the new EPA rules. Both North Carolina and South Carolina have revised their SIPs in response to the EPAs 1998 rule, and are awaiting EPA approval. Legislation was introduced in the North Carolina General Assembly in 2001 and passed by the state Senate that would require North Carolina electric utilities, including Duke Energy, to make significant reductions in emissions of sulfur dioxide and nitrogen oxides from coal-fired power plants over the next seven to 11 years. Management estimates Duke Energys cost of achieving the proposed emission reductions to be approximately $1.5 billion. A provision in the proposed North Carolina legislation allows Duke Energy to recover those costs from customers through an environmental compliance expenditure-recovery factor that is separate from the electric utilitys base rates. If passed into law, the final provisions could be significantly different from the proposal. Emission control retrofits needed to comply with the new rules are large technical, design and construction projects. These projects will be managed closely to ensure the continuation of reliable electric service to Duke Energys customers throughout the projects and upon their completion. In 2000, the U.S. Justice Department, acting on behalf of the EPA, filed a complaint against Duke Energy in the U.S. District Court in Greensboro, North Carolina, for alleged violations of the New Source Review (NSR) provisions of the CAA. The EPA claims that 29 projects performed at 25 of Duke Energys coal-fired units were major modifications, as defined in the CAA, and that Duke Energy violated the CAAs NSR requirements when it undertook those projects without obtaining permits and installing emission controls for sulfur dioxide, nitrogen oxide and particulate matter. The complaint asks the court to order Duke Energy to stop operating the coal-fired units identified in the complaint, install additional emission controls and pay unspecified civil penalties. This complaint is part of the EPAs NSR enforcement initiative, in which the EPA claims that utilities and others have committed widespread violations of the CAA permitting requirements for the past 25 years. The EPA has sued or issued notices of violation of investigative information requests to at least 48 other electric utilities and cooperatives. The EPAs allegations run counter to previous EPA guidance regarding the applicability of the NSR permitting requirements. Duke Energy, along with other utilities, has routinely undertaken the type of repair, replacement and maintenance projects that the EPA now claims are illegal. Duke Energy believes that all of its electric generation units are properly permitted and have been properly maintained, and is defending itself vigorously against these alleged violations. The U.S. Vice Presidents National Energy Policy Development Group has ordered the EPA to review its NSR rules and has ordered the Department of Justice to review the appropriateness of the enforcement cases. The EPA review was scheduled to be completed by August 2001, but has not yet been concluded. In January 2002, the Department of Justice released a report concluding that it was not improper for the Department of Justice to initiate the enforcement cases brought on behalf of the EPA. It specifically declined to address whether the EPAs enforcement actions are wise as a matter of national energy policy. Because these matters are in a preliminary stage, management cannot estimate the effects of these matters on Duke Energys future consolidated results of operations, cash flows or financial position. The CAA authorizes civil penalties of up to $27,500 per day per violation at each generating unit. Civil penalties, if ultimately imposed by the court, and the cost of any required new pollution control equipment, if the court accepts the EPAs contentions, could be substantial. _GLOBAL CLIMATE CHANGE In 1997, the United Nations held negotiations in Kyoto, Japan, to determine how to minimize global warming. The resulting Kyoto Protocol prescribed, among other greenhouse gas emission reduction tactics, carbon dioxide emission reductions from fossil-fueled electric generating facilities in the U.S. and other developed nations, as well as methane emission reductions from natural gas operations. The high-level operational framework for implementing the Kyoto Protocol was agreed to in November 2001. If the Kyoto Protocol were to be implemented in developed countries where Duke Energy operates, it could have far-reaching implications for Duke Energy and the entire energy industry. However, the outcome and timing of these implications are highly uncertain, and Duke Energy cannot estimate the effects on future consolidated results of operations, cash flows or financial position. Duke Energy remains engaged in discussions with those developing public policy initiatives and continuously assesses the commercial implications for its markets around the world. NOTICE OF PROPOSED RULEMAKING (NOPR) On September 27, 2001, the FERC issued a NOPR announcing that it is considering new regulations regarding standards of conduct that would apply uniformly to natural gas pipelines and electric transmitting public utilities that are currently subject to different gas or electric standards. The proposed standards would change how companies and their affiliates interact and share information by broadening the definition of affiliate covered by the standards of conduct, from the more narrow definition in the existing regulations. The NOPR also seeks comment on whether the standards of conduct should be broadened to include the separation of those involved in the bundled retail electric sales function from those in the transmission function, as the current standards apply only to those involved in wholesale activities. Various entities filed comments on the NOPR with the FERC, including Duke Energy which filed on December 20, 2001. The FERC has indicated that they appreciate the complexity of the issues and that they would prefer having a technical conference before entering directly into a final rulemaking. No notice of a technical conference has been given at this time. REGULATORY MATTERS In 2001, the NCUC and PSCSC began a joint investigation, along with the Public Staff of the NCUC, regarding certain Duke Power regulatory accounting entries for 1998. In its internal review of the 14 entries in question, Duke Energy concluded that nine items were correctly classified for regulatory accounting. Four items were incorrectly classified for regulatory purposes for 1998 only, and did not recur. The classification of the remaining item, distributions from a mutual insurance company, is subject to differing regulatory interpretations. Duke Energy believes this item was appropriately classified, but is evaluating its classification for future years. As part of their investigation, the NCUC and PSCSC have jointly engaged an independent firm to conduct an audit of Duke Powers accounting records for reporting periods from 1998 through June 30, 2001. Duke Energy continues to fully cooperate with the commissions in their investigation. As requested by the NCUC, Duke Energy has recorded the 2001 mutual insurance distribution, approximately $33 million, in a deferred credit account on the Consolidated Balance Sheets, pending final outcome of the independent audit. CALIFORNIA ISSUES Duke Energy, some of its subsidiaries and three current or former executives have been named as defendants, among other corporate and individual defendants, in one or more of a total of six lawsuits brought by or on behalf of electricity consumers in the State of California. The plaintiffs seek damages as a result of the defendants alleged unlawful manipulation of the California wholesale electricity markets. DENA and DETM are among 16 defendants in a class-action lawsuit (the Gordon lawsuit) filed against generators and traders of electricity in California markets. DETM was also named as one of numerous defendants in four additional lawsuits, including two class actions (the Hendricks and Pier 23 Restaurant lawsuits), filed against generators, marketers, traders and other unnamed providers of electricity in California markets. A sixth lawsuit (the Bustamante lawsuit) was brought by the Lieutenant Governor of the State of California and a State Assemblywoman, on their own behalf as citizens and on behalf of the general public, and includes Duke Energy, some of its subsidiaries and three current or former executives of Duke Energy among other corporate and individual defendants. The Gordon and Hendricks class-action lawsuits were filed in the Superior Court of the State of California, San Diego County, in November 2000. Three other lawsuits were filed in January 2001, one in Superior Court, San Diego County, and the other two in Superior Court, County of San Francisco. The Bustamante lawsuit was filed in May 2001 in Superior Court, Los Angeles County. These lawsuits generally allege that the defendants manipulated the wholesale electricity markets in violation of state laws against unfair and unlawful business practices and state antitrust laws. The plaintiffs seek aggregate damages of billions of dollars. The lawsuits seek the refund of alleged unlawfully obtained revenues for electricity sales and, in four lawsuits, an award of treble damages. These suits have been consolidated before a state court judge in San Diego. While these matters are in their earliest stages, management believes, based on its analysis of the facts and the asserted claims, that their resolution will have no material adverse effect on Duke Energys consolidated results of operations, cash flows or financial position. In addition to the lawsuits, several investigations and regulatory proceedings at the state and federal levels are looking into the causes of high wholesale electricity prices in the western U.S. At the federal level, numerous proceedings are before the FERC. Some parties to those proceedings have made claims for billions of dollars of refunds from sellers of wholesale electricity, including DETM. Some parties have also sought to revoke the authority of DETM and other DENA-affiliated electricity marketers to sell electricity at market-based rates. The FERC is also conducting its own wholesale pricing investigation. As a result, the FERC has ordered some sellers, including DETM, to refund, or to offset against outstanding accounts receivable, amounts billed for electricity sales in excess of a FERC-established proxy price. The proxy price represents what the FERC believes would have been the market-clearing price in a perfectly competitive market. In June 2001, DETM offset approximately $20 million against amounts owed by the California Independent System Operator and the California Power Exchange for electricity sales during January and February 2001. This offset reduced the $110 million reserve established in 2000 to $90 million. Proceedings are ongoing to determine, among other issues, the amount of any refunds or offsets for periods prior to January 2001, and the method to be used to determine the proxy price in future months. At the state level, the California Public Utilities Commission is conducting formal and informal investigations to determine if power plant operators in California, including some Duke Energy entities, have improperly withheld, either economically or physically, generation output from the market to manipulate market prices. In addition, the California State Senate formed a Select Committee to Investigate Price Manipulation of the Wholesale Energy Market (Select Committee). The Select Committee has served a subpoena on Duke Energy and some of its subsidiaries seeking data concerning their California market activities. The Select Committee has heard testimony from several witnesses but no one from Duke Energy has yet been subpoenaed to testify. The California Attorney General is also conducting an investigation to determine if any market participants engaged in illegal activity, including antitrust violation, in the course of their electricity sales into wholesale markets in the western U.S. The Attorneys General of Washington and Oregon are participating in the California Attorney Generals investigation. The San Diego District Attorney is conducting a separate investigation into market activities and has issued subpoenas to DETM and a DENA subsidiary. The California Attorney General has also convened a grand jury to determine whether criminal charges should be brought against any market participants. To date, no Duke Energy employee has been called to testify before the grand jury nor have any criminal charges been filed against Duke Energy or any of its officers, directors or employees in connection with the wholesale electricity markets in the states of the western U.S. Throughout 2001, Duke Energy conducted its business in California to supply the maximum possible electricity to meet the needs of the state, limit its exposure to non-creditworthy counterparties and manage the output limitations on its power plants imposed by applicable permits and laws. Since December 31, 2000, Duke Energy has closely managed the balance of doubtful receivables, and believes that the current pre-tax bad debt provision of $90 million is appropriate. No additional provisions for California receivables were recorded in 2001. Management believes, based on its analysis of the facts and the asserted claims, that the resolution of these matters will have no material adverse effect on Duke Energys consolidated results of operations, cash flows or financial position. LITIGATION AND CONTINGENCIES _EXXON MOBIL CORPORATION ARBITRATION In 2000, three Duke Energy subsidiaries initiated binding arbitration against three Exxon Mobil Corporation subsidiaries (the Exxon Mobil entities) concerning the parties joint ownership of DETM and related affiliates (the Ventures). At issue is a buy-out right provision under the joint venture agreements for these entities. If there is a material business dispute between the parties, which Duke Energy alleges has occurred, the buy-out provision gives Duke Energy the right to purchase Exxon Mobils 40% interest in DETM. Exxon Mobil does not have a similar right under the joint venture agreements and once Duke Energy exercises the buy-out right, each party has the right to unwind the buy-out under certain specific circumstances. In December 2000, Duke Energy exercised its right to buy the Exxon Mobil entities interest in the Ventures. Duke Energy claims that refusal by the Exxon Mobil entities to honor the exercise is a breach of the buy-out right provision, and seeks specific performance of the provision. Duke Energy has also made additional claims against the Exxon Mobil entities for breach of the agreements governing the Ventures. In January 2001, the Exxon Mobil entities made counterclaims in the arbitration and, in a separate Texas state court action, alleged that Duke Energy breached its obligations to the Ventures and to the Exxon Mobil entities. In April 2001, the state court stayed its action, compelling the Exxon Mobil entities to arbitrate their claims. The Exxon Mobil entities proceeded with the arbitration of their claims and have not challenged this order in an appellate court. In early October 2001, the arbitration panel convened an evidentiary hearing regarding the buy-out right provision and Duke Energys and Exxon Mobils claims against each other. The panel has not yet ruled but Duke Energy expects a final decision from the panel in early 2002. Management believes that the final disposition of this action will have no material adverse effect on Duke Energys consolidated results of operations or financial position. Duke Energy and its subsidiaries are involved in other legal, tax and regulatory proceedings before various courts, regulatory commissions and governmental agencies regarding performance, contracts and other matters arising in the ordinary course of business, some of which involve substantial amounts. Management believes that the final disposition of these proceedings will have no material adverse effect on consolidated results of operations, cash flows or financial position. (See Note 15 to the Consolidated Financial Statements for information concerning litigation and other commitments and contingencies.) NEW ACCOUNTING STANDARDS In June 2001, the FASB issued SFAS No. 141, Business Combinations, and SFAS No. 142, Goodwill and Other Intangible Assets. SFAS No. 141 requires that all business combinations initiated (as defined by the standard) after June 30, 2001 be accounted for using the purchase method. Companies may no longer use the pooling method of accounting for future combinations. SFAS No. 142 is effective for fiscal years beginning after December 15, 2001, and was adopted by Duke Energy as of January 1, 2002. SFAS No. 142 requires that goodwill no longer be amortized over an estimated useful life, as previously required. Instead, goodwill amounts will be subject to a fair-value-based annual impairment assessment. The standard also requires certain identifiable intangible assets to be recognized separately and amortized as appropriate. No such intangibles have been identified at Duke Energy. Duke Energy expects the adoption of SFAS No. 142 to have an impact on future financial statements, due to the discontinuation of goodwill amortization expense. For 2001, pre-tax goodwill amortization expense was $101 million. The FASB and the EITF continue to respond to questions to clarify key aspects of SFAS No. 142. Duke Energy has determined the effect of implementing SFAS No. 142 and does not expect to record any impairment in 2002. In July 2001, the FASB issued SFAS No. 143, Accounting for Asset Retirement Obligations. SFAS No. 143 provides the accounting requirements for retirement obligations associated with tangible long-lived assets. It is effective for fiscal years beginning after June 15, 2002, and early adoption is permitted. Duke Energy is currently assessing the new standard and has not yet determined the impact on its consolidated results of operations or financial position. In August 2001, the FASB issued SFAS No. 144, Accounting for the Impairment or Disposal of Long-Lived Assets. The new rules supersede SFAS No. 121, Accounting for the Impairment of Long-Lived Assets and for Long-Lived Assets to Be Disposed Of. The new rules retain many of the fundamental recognition and measurement provisions, but significantly change the criteria for classifying an asset as held-for-sale. SFAS No. 144 is effective for fiscal years beginning after December 15, 2001. Duke Energy has evaluated the new standard, and management believes that it will have no material adverse effect on Duke Energys consolidated results of operations or financial position. ENERGY INDUSTRY AND ACCOUNTING PRACTICES The energy industry landscape changed during 2001. The bankruptcy of Enron (See Quantitative and Qualitative Disclosures About Market Risk Credit Risk), the tragic events of September 11, 2001 and the global economic downturn will likely have continued impacts on the industry. Near-term economic growth is likely to be lower and more cyclical than in the recent past. As a result, industrial or commercial customers and trading counterparties could reduce their business volume with Duke Energy. However, overall demand for power is still on the rise. Current estimates place demand growth for power between 1% and 2% annually over the next decade. Duke Energy will continue to seek opportunities to reduce the risks associated with economic impacts on its customers, and help markets achieve desired supply/demand equilibrium and infrastructure reliability. The situation surrounding Enrons bankruptcy has forced regulators and legislators to take a renewed look at accounting practices, financial disclosures, companies relationships with their independent auditors and retirement plan practices. Duke Energy cannot predict the ultimate impact of any future changes in laws or regulations. However, Duke Energy is committed to complying with all laws and regulations and will continue to play an active role in helping to shape future laws and regulations as they evolve. PENDING ACQUISITION OF WESTCOAST ENERGY INC. In September 2001, Duke Energy announced its plans to acquire Westcoast for approximately $8 billion, including the assumption of debt. Westcoast, headquartered in Vancouver, British Columbia, is a North American energy company with interests in natural gas gathering, processing, transmission, storage and distribution, as well as power generation and international energy businesses. In the pending transaction, Duke Energy would acquire all outstanding common shares of Westcoast in exchange for a combination of cash, Duke Energy common shares and exchangeable shares of a Canadian subsidiary of Duke Energy such that 50% of the consideration will be paid in cash and 50% in stock. The transaction is expected to close by the end of the first quarter of 2002, subject to regulatory approvals. The transaction will be accounted for using the purchase method of accounting. SUBSEQUENT EVENT On January 31, 2002, Duke Energy announced the planned sale of its DE&S business unit to Framatome ANP, Inc. (a nuclear supplier) for approximately $84 million. Two components of DE&S are not part of the sale. Duke Energy will establish Duke Energy Energy Delivery Services, formed by the power delivery services component of DE&S, which will continue to supply power delivery solutions to customers. Leadership of the U.S. Department of Energy Mixed Oxide Fuel project will also remain with Duke Energy. The transaction will require a Hart Scott Rodino filing and is expected to close in the second quarter of 2002. FORWARD-LOOKING STATEMENTS Duke Energys reports, filings and other public announcements may include statements that reflect assumptions, projections, expectations, intentions or beliefs about future events. These statements are intended as forward-looking statements under the Private Securities Litigation Reform Act of 1995. Generally, the words may, could, project, believe, anticipate, expect, estimate, plan, forecast, intend and similar words identify forward-looking statements, which generally are not historical in nature. All such statements (other than statements of historical facts), including statements regarding operating performance, financial position, business strategy, budgets, projected costs, plans and objectives of management for future operations and events or developments that we expect or anticipate will occur in the future, are forward looking. Forward-looking statements are subject to certain risks and uncertainties that could, and often do, cause actual results to differ from Duke Energys historical experience and our present expectations or projections. Accordingly, there can be no assurance that actual results will not differ materially from those expressed or implied by the forward-looking statements. Caution should be taken not to place undue reliance on any such forward-looking statements. Factors that could cause actual results to differ materially from the expectations expressed or implied in such forward-looking statements include, but are not limited to: state, federal and foreign legislative and regulatory initiatives that affect cost and investment recovery, have an impact on rate structures and affect the speed and degree at which competition enters the electric and natural gas industries; industrial, commercial and residential growth in the service territories of Duke Energy and its subsidiaries; the weather and other natural phenomena; the timing and extent of changes in commodity prices, interest rates and foreign currency exchange rates; changes in environmental and other laws and regulations to which Duke Energy and its subsidiaries are subject or other external factors over which Duke Energy has no control; the results of financing efforts, including Duke Energys ability to obtain financing on favorable terms, which can be affected by Duke Energys credit rating and general economic conditions; level of creditworthiness of counterparties to transactions; growth opportunities for Duke Energys business units; and the effect of accounting policies issued periodically by accounting standard-setting bodies. |
|
||||||||||||||||||||||||||||||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||