PPT Slide
Existing Surface Drilling
At Target Elevation
Surface Projection of
+0.2 oz/t Au Intercepts
Deep Post: +0.2 oz/t
Footprint
0
500
Feet
NORTH
North Gold Margin
DPC-86 100’/0.481
DPC-87 200’/0.606
DPC-91 140’/0.820
DPC-93 14’/0.620
DPC-94 32.5’/0.575
37’/0.371
Intercepts (oz/t)
Previous slide
Next slide
Back to first slide
View graphic version