PPT Slide
- 5 Million Acres
- Drilled Adam 1 Discovery in 2002
- Prolific TAGI & Silurian Sand Plays
- Pipeline Infrastructure
- Shallow Targets, Low Cost
- Five Permits
- Bazma, Jorf & El Hamra Blocks
- 50% Participating Interest
- Pioneer Operates
- Anaguid Block
- 39% Participating Interest
- Anadarko Operates
- Borj El Khadra (BEK) Block
- 40% Participating Interest
- Oil Discovery on Adam 1
- Tested 6,000 BPD
- AGIP Operates
- Expect to drill at least 6 prospects during 2003