Purpose & Key Study Parameters
Purpose of Study: Measure the optimal operational efficiency of Enterprise, Express and Pathfinder-class drilling rigs relative to prior fourth- and third-generation units
Key Parameters
- Selected best performance for each particular component of the well section for each rig class (excluded downtime)
- 5,000 ft. water depth well
- Total well depth of 22,000 ft.