East Boulder MineConcentrator
- 54,000 tons processed through October 25
- 0.33 opt grade of low-grade development muck
- 88% metallurgical recovery achieved on low- grade
- 90% expected on ore production
- 13,000 ounces pre-commercial production through October 25