![]() |
Return |
General Insurance Duke Energy carries insurance coverage consistent with companies engaged in similar commercial operations with similar type properties. Duke Energys insurance coverage includes (1) commercial general public liability insurance for liabilities arising to third parties for bodily injury and property damage resulting from our operations; (2) workers compensation liability coverage to required statutory limits; (3) automobile liability insurance for all owned, non-owned and hired vehicles covering liabilities to third parties for bodily injury and property damage, and (4) property insurance covering the replacement value of all real and personal property damage, excluding electric transmission and distribution lines, including damages arising from boiler and machinery breakdowns, earthquake, flood damage and business interruption/extra expense. All coverages are subject to certain deductibles, terms and conditions common for companies with similar types of operations. Duke Energy also maintains excess liability insurance coverage above the established primary limits for commercial general liability and automobile liability insurance. Limits, terms, conditions and deductibles are comparable to those carried by other energy companies of similar size. The costs of Duke Energys general insurance coverage have increased significantly over the past year reflecting general conditions in the insurance markets. Nuclear Insurance Duke Energy owns and operates the McGuire and Oconee Nuclear Stations and operates and has a partial ownership interest in the Catawba Nuclear Station. The McGuire and Catawba Nuclear Stations have two nuclear reactors each and Oconee has three. Nuclear insurance includes: liability coverage; property, decontamination and decommissioning coverage; and business interruption and/or extra expense coverage. The other joint owners of the Catawba Nuclear Station reimburse Duke Energy for certain expenses associated with nuclear insurance premiums. The Price-Anderson Act requires Duke Energy to insure against public liability claims resulting from nuclear incidents to the full limit of liability, approximately $9.5 billion. Primary Liability Insurance. Duke Energy has purchased the maximum available private primary liability insurance, $200 million, as required by law. As of January 1, 2003, $300 million in private primary liability insurance became available and Duke Energy purchased that amount along with a like amount to cover certain worker tort claims. Excess Liability Insurance. This policy currently provides approximately $9.3 billion of coverage through the Price-Anderson Acts mandatory industry-wide excess secondary insurance program of risk pooling. The $9.3 billion is the sum of the current potential cumulative retrospective premium assessments of $88 million per licensed commercial nuclear reactor. This would be increased by $88 million for each additional commercial nuclear reactor licensed, or reduced by $88 million for nuclear reactors no longer operational and may be exempted from the risk pooling insurance program. Under this program, licensees could be assessed retrospective premiums to compensate for damages in the event of a nuclear incident at any licensed facility in the U.S. If such an incident should occur and public liability damages exceed primary insurances, licensees may be assessed up to $88 million for each of their licensed reactors, payable at a rate not to exceed $10 million a year per licensed reactor for each incident. The $88 million is subject to indexing for inflation and may be subject to state premium taxes. Duke Energy is a member of Nuclear Electric Insurance Limited (NEIL), which provides property and business interruption insurance coverage for Duke Energys nuclear facilities under three policy programs: Primary Property Insurance. This policy provides $500 million of primary property damage coverage for each of Duke Energys nuclear facilities. Excess Property Insurance. This policy provides excess property, decontamination and decommissioning liability insurance: $2.25 billion for the Catawba Nuclear Station and $2.0 billion each for the Oconee and McGuire Nuclear Stations. Business Interruption Insurance. This policy provides business interruption and/or extra expense coverage resulting from an accidental outage of a nuclear unit. Each McGuire and Catawba unit is insured for up to approximately $4 million per week, and the Oconee units are insured for up to approximately $3 million per week. Coverage amounts decline if more than one unit is involved in an accidental outage. Initial coverage begins after a 12-week deductible period and continues at 100% for 52 weeks and 80% for the next 110 weeks. If NEILs losses exceed its reserves for any of the above three programs, Duke Energy is liable for assessments of up to 10 times its annual premiums. The current potential maximum assessments are: Primary Property Insurance$35 million, Excess Property Insurance$40 million and Business Interruption Insurance$29 million. The other joint owners of the Catawba Nuclear Station are obligated to assume their pro rata share of liability for retrospective premiums and other premium assessments resulting from the Price-Anderson Acts excess secondary insurance program of risk pooling, or the NEIL policies. Environmental Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. Remediation activities. Duke Energy and its affiliates are responsible for environmental remediation at various impacted properties or contaminated sites similar to others in the energy industry. These include some properties that are part of ongoing Duke Energy operations, as well as sites formerly owned or used by Duke Energy entities and sites owned by third parties. These matters typically involve management of contaminated soils and may involve ground water remediation. They are managed in conjunction with the relevant federal, state and local agencies. These sites or matters vary, for example, with respect to site conditions and location, remedial requirements, sharing of responsibility by other entities, and complexity. Certain matters can involve statutory joint and several liability provisions, strict liability, or cost recovery or contribution actions, whereby Duke Energy or its affiliates could potentially be held responsible for contamination caused by other parties. In some instances, Duke Energy may share any liability associated with contamination with other potentially responsible parties, and Duke Energy may benefit from insurance policies or contractual indemnities that cover some cleanup costs. All these sites generally are managed in the normal course of the respective business or affiliate operations. Management believes that completion or resolution of these matters will have no material adverse effect on consolidated results of operations, cash flows, or financial position. Air Quality Control. In 1998, the Environmental Protection Agency (EPA) issued a final rule on regional ozone control that required 22 eastern states and the District of Columbia to revise their State Implementation Plans (SIPs) to significantly reduce emissions of nitrogen oxide by May 1, 2003. The EPA rule was challenged in court by various states, industry and other interests, including Duke Energy and the states of North Carolina and South Carolina. In 2000, the court upheld most aspects of the EPA rule. The same court subsequently extended the compliance deadline for implementation of emission reductions to May 31, 2004. Both North Carolina and South Carolina have revised their SIPs in response to the EPAs 1998 rule, and the EPA has approved these revisions. Duke Energy has incurred approximately $380 million in capital costs for emission controls through 2002 for compliance with the EPAs rule. Management estimates that Duke Energys remaining capital expenditures to complete the installation of emission controls needed to comply with the EPAs rule will be approximately $300 million. These remaining expenditures will be incurred through 2004. In June 2002, the state of North Carolina passed new clean air legislation that includes provisions that freeze electric utility rates from June 20, 2002 (the effective date of the statute) to December 31, 2007 (rate freeze period), subject to certain conditions, in order for North Carolina electric utilities, including Duke Energy, to make significant reductions in emissions of sulfur dioxide and nitrogen oxides from the states coal-fired power plants over the next ten years. Management estimates Duke Energys cost of achieving the proposed emission reductions over the next ten years to be approximately $1.5 billion in total. Included in the legislation are provisions that allow electric utilities, including Duke Energy, to accelerate the recovery of these compliance costs by amortizing them over seven years (2003-2009). During the rate freeze period, Duke Energy is expected to recover 70% of the total estimated costs of plant improvements. In years six and seven of the recovery period, the NCUC will determine how any remaining costs will be recovered. Emission control retrofits needed to comply with the new legislation are large technical, design and construction projects. These projects will be managed closely to ensure the continuation of reliable electric service to Duke Energys customers throughout the projects and upon their completion. In 2000, the U.S. Justice Department, acting on behalf of the EPA, filed a complaint against Duke Energy in the U.S. District Court in Greensboro, North Carolina, for alleged violations of the New Source Review (NSR) provisions of the Clean Air Act (CAA). The EPA claims that 29 projects performed at 25 of Duke Energys coal-fired units were major modifications, as defined in the CAA, and that Duke Energy violated the CAAs NSR requirements when it undertook those projects without obtaining permits and installing emission controls for sulfur dioxide, nitrogen oxide and particulate matter. The complaint asks the court to order Duke Energy to stop operating the coal-fired units identified in the complaint, install additional emission controls and pay unspecified civil penalties. This complaint is part of the EPAs NSR enforcement initiative, in which the EPA claims that utilities and others have committed widespread violations of the CAA permitting requirements for the past 25 years. The EPA has sued, or issued notices of violation or investigative information requests, to at least 94 other electric utilities and cooperatives. The EPAs allegations run counter to previous EPA guidance regarding the applicability of the NSR permitting requirements. Duke Energy, along with other utilities, has routinely undertaken the type of repair, replacement and maintenance projects that the EPA now claims are illegal. Duke Energy believes that all of its electric generation units are properly permitted and have been properly maintained, and is defending itself vigorously against these alleged violations. Trial is tentatively set for September 2003. The CAA authorizes civil penalties of up to $27,500 per day per violation at each generating unit. Civil penalties, if ultimately imposed by the court, and the cost of any required new pollution control equipment, if the court accepts the EPAs contentions, could be substantial. The EPAs final and proposed NSR reforms, published in 2002, have no direct effect on the status of Duke Energys lawsuit. Because these matters are in a preliminary stage, management cannot estimate the effects of these matters on Duke Energys future consolidated results of operations, cash flows or financial position. Global Climate Change. In 1997, the United Nations held negotiations in Kyoto, Japan, as part of an ongoing process to address concerns over global warming and climate change. The resulting Kyoto Protocol prescribed greenhouse gas emission reductions among developed countries equivalent to five percent below their 1990 aggregate emission levels. While the Kyoto Protocol does not mandate specific mitigation actions or approaches, most participating developed nations understood an area of focus would be on reducing green house gas emissions at their sources, including, among other sources, fossil-fueled electric power generation and natural gas operations. In 2001 President George W. Bush stated his opposition to the Kyoto Protocol, and declared that the U.S. will not ratify it. Australia, where Duke Energy has natural gas pipeline and some electric generation assets, has also declined to ratify the Kyoto Protocol. Over 100 other countries have, however, ratified the Kyoto Protocol and it is possible that the agreement will enter into force and effect if other nations follow suit. Canada, where Duke Energy owns and operates natural gas pipeline assets, ratified the Kyoto Protocol in December 2002. If Russia were also to ratify the Kyoto Protocol, then the treaty would enter into force and Canada would be obligated to reduce its average greenhouse gas emissions to 6% below 1990 levels over the period 2008 to 2012. In anticipation of the entry into force of the Kyoto Protocol, Canada is developing an implementation plan contemplating a mix of sector-specific measures requiring a range of mandatory business actions to achieve emissions reductions, as well as emissions caps coupled with an emissions trading system. Targets for emissions reductions under such a Canadian scheme could be established under negotiated covenants with industry sectors, including the oil and gas sector, which encompasses most of Duke Energys Canadian natural gas pipeline assets. Should the Kyoto Protocol enter into force, and depending on the nature of policies and measures adopted by the Canadian government, it is possible that Duke Energys Canadian assets could be required to reduce its present emissions of greenhouse gases in some manner and/or to purchase emissions credits in the Canadian market or take other steps. In these and other respects, the entry into force of the Kyoto Protocol, and the domestic policies and measures of countries participating in the treaty regime, could have far-reaching and significant implications for industries in those countries, including their respective energy sectors. These developments could specifically affect Duke Energy operations in those countries that are participating in the Kyoto Protocol, like Canada. It might also provide new opportunities to companies, for example, in the natural gas sector or in emissions trading and marketing arenas. There are also U.S. and Australian domestic or state-specific initiatives and proposals that could have analogous effects on segments of the energy sector on different scales. The outcome of these discussions and negotiations, like those occurring in Canada as described above, is highly uncertain, and Duke Energy cannot estimate the effects these discussions and negotiations might have on future consolidated results of operations, cash flows or financial position. Duke Energy stays abreast of and engaged in the Kyoto Protocol discussions and related developments concerning the climate change issue, and will continue to assess and respond to its potential implications for Duke Energys business operations in the U.S., Canada and around the world. Extended Environmental Activities, Accruals. Included in Other Current Liabilities and Other Deferred Credits and Other Liabilities were accruals related to extended environmental-related activities of $97 million at December 31, 2002 and $162 million at December 31, 2001. The accrual for extended environmental-related activities represents Duke Energys provisions for costs associated with some of its current and former sites and certain other environmental matters. Management believes that completion or resolution of these matters will have no material adverse effect on consolidated results of operations, cash flows, or financial position. Litigation Western Power Disputes. California Litigation. Duke Energy, some of its subsidiaries and three current or former executives have been named as defendants, along with numerous other corporate and individual defendants, in one or more of a total of 15 lawsuits filed in California on behalf of purchasers of electricity in the State of California, with one suit filed on behalf of a Washington state electricity purchaser. Most of these lawsuits seek class-action certification and damages and other relief, as a result of the defendants alleged unlawful manipulation of the California wholesale electricity markets. These lawsuits generally allege that the defendants manipulated the wholesale electricity markets in violation of state laws against unfair and unlawful business practices and, in some suits, in violation of state antitrust laws. Plaintiffs in these lawsuits seek aggregate damages of billions of dollars. The lawsuits seek the restitution and/or disgorgement of alleged unlawfully obtained revenues for sales of electricity and, in some lawsuits, an award of treble damages for alleged violations of state antitrust laws. The first six of these lawsuits were filed in late 2000 through mid-2001 and were consolidated before a single judge in San Diego. The plaintiffs in the six lawsuits filed a joint Master Amended Complaint in March 2002, which added additional defendants. The claims against the additional defendants are similar to those in the original complaints. In April 2002, some defendants, including Duke Energy, filed cross-complaints against various market participants not named as defendants in the plaintiffs original and amended complaints. In May 2002, certain cross-defendants removed these actions to federal court in San Diego. The other nine of these 15 suits were filed in mid-to-late 2002. The state court suits have been removed to federal court, and all suits have been transferred to federal court in San Diego for pre-trial consolidation with the previously filed six lawsuits. Various motions are pending before the courts, including motions concerning the jurisdiction of the courts and motions to dismiss claims of the parties. In December 2002, the court ordered the remand of the original six suits, and certain defendants and cross-defendants have appealed that ruling. In February 2003, the Court of Appeals for the 9 th Circuit issued an order accepting the appeal and stayed the remand order of the district court. In January 2003, the federal court in San Diego granted the motion of the defendants to dismiss the suit filed by the Washington state plaintiff. The court ruled that the plaintiffs state law claims, including alleged violations of the California antitrust and unfair business practices laws, were barred on filed rate and federal preemption grounds. In addition to the foregoing lawsuits, in March 2003 a California state court in Los Angeles unsealed a lawsuit originally filed in August 2002 against numerous energy company defendants, including DETM. The plaintiffs, seeking to act on behalf of the State of California under the False Claims Act, made claims similar to those in other lawsuits alleging manipulation of the electricity market in California, and claims that defendants, conspiring to defraud state governmental entities, made false records or statements. The plaintiffs seek unspecified damages in the maximum amount allowed under the pertinent laws. Related Oregon and Washington Litigation. In December 2002, plaintiffs filed class-action suits against Duke Energy and numerous other energy companies in state court in Oregon and in federal court in Washington state making allegations similar to those in the California suits. Plaintiffs allege they paid unreasonably high prices for electricity and/or natural gas during the time period from January 2000 to the present as a result of defendants activities which were fraudulent, negligent and in violation of each states business practices laws. Among other things, they seek damages, an order from the court prohibiting the defendants from engaging in the alleged unlawful acts complained of, and an accounting of the transactions entered into for the purchase and sale of wholesale energy. Trade publications. In November 2002, the Lieutenant Governor of the State of California, on behalf of himself, the general public and taxpayers of California, filed a class-action suit against the publisher of natural gas trade publications and numerous other defendants, including seven Duke Energy entities, in state court in Los Angeles, alleging that the defendants engaged in various unlawful acts, including artificially inflating the index prices of natural gas reported in industry publications through collusive behavior, and have thereby violated state business practices laws. The plaintiffs seek an order prohibiting the defendants from engaging in the acts complained of, restitution, disgorgement of profits acquired through defendants alleged unlawful acts, an award of civil fines, compensatory and punitive damages in unspecified amounts and other appropriate relief. Other proceedings. In addition to the lawsuits, several investigations and regulatory proceedings at the state and federal levels are looking into the causes of high wholesale electricity prices in the western U.S. during 2000 and 2001. At the federal level, numerous proceedings are before the FERC. Some parties to those proceedings have made claims for billions of dollars of refunds from sellers of wholesale electricity, including DETM. Some parties have also sought to revoke the authority of DETM and other DENA-affiliated electricity marketers to sell electricity at market-based rates. The FERC is also conducting its own wholesale pricing investigation. As a result, the FERC has ordered some sellers, including DETM, to refund, or to offset against outstanding accounts receivable, amounts billed for electricity sales in excess of a FERC-established proxy price. In June 2001, DETM offset approximately $20 million against amounts owed by the California Independent System Operator (CAISO) and the California Power Exchange (CalPX) for electricity sales during January and February 2001. This offset reduced the $110 million reserve established in 2000 to $90 million. Since December 31, 2000, Duke Energy has closely managed the balance of doubtful receivables, and believes that the current pre-tax bad debt provision of $90 million is appropriate. No additional provisions for California receivables and market risk were recorded in 2001 or 2002. In December 2002, the presiding administrative law judge in the FERC refund proceedings issued his proposed findings with respect to the mitigated market clearing price, including his preliminary determinations of the refund liability of each seller of electricity in the CAISO and CalPX. These proposed findings estimate that DETM has refund liability of approximately $95 million in the aggregate to both the CAISO and CalPX. This would be offset against the remaining receivables still owed to DETM by the CAISO and CalPX. The proposed findings are the presiding judges estimates only, and are still subject to further recalculation and adoption by the FERC in connection with its ongoing wholesale pricing investigation. On March 3, 2003, various parties (including the California attorney general) filed at the FERC seeking modification of the FERCs refund orders alleging that DETM and others manipulated wholesale electricity prices in periods prior to the initial refund period. DETM is preparing a response to these allegations which is due to the FERC on March 20, 2003. At the state level, the California Public Utilities Commission is conducting formal and informal investigations to determine if power plant operators in California, including some Duke Energy entities, have improperly withheld, either economically or physically, generation output from the market to manipulate market prices. In addition, the California State Senate formed a Select Committee to Investigate Price Manipulation of the Wholesale Energy Market (Select Committee). The Select Committee served a subpoena on Duke Energy and some of its subsidiaries seeking data concerning their California market activities. The Select Committee heard testimony from several witnesses but no one from Duke Energy has been subpoenaed to testify. The California Attorney General is also conducting an investigation to determine if any market participants engaged in illegal activity, including antitrust violations, in the course of their electricity sales into wholesale markets in the western U.S. The Attorneys General of Washington and Oregon are participating in the California Attorney Generals investigation. The San Diego District Attorney is conducting a separate investigation into market activities and issued subpoenas to DETM and a DENA subsidiary. The U.S. Attorneys Office in San Francisco served a grand jury subpoena on Duke Energy in November 2002 seeking, in general, information relating to possible manipulation of the electricity markets in California, including potential antitrust violations. As with the other ongoing investigations related to the California electricity markets, Duke Energy is cooperating with the U.S. Attorneys Office in connection with its investigation. Sacramento Municipal Utility District (SMUD) and City of Burbank, California FERC Complaints. In July 2002 and August 2002, respectively, the Sacramento Municipal Utility District and the City of Burbank, California filed complaints with the FERC against DETM and other providers of wholesale energy requesting that the FERC mitigate alleged unjust and unreasonable prices in sales contracts entered into between DETM and the complainants in the first quarter of 2001. The complainants, alleging that DETM had the ability to exercise market power, claim that the contract prices are unjust and unreasonable because they were entered into during a period that the FERC determined the western markets to be dysfunctional and uncompetitive and that the western markets influenced their price. In support of their request to mitigate the contract price, the complainants rely on the fact that the contract prices are higher than prices in the West following implementation of the FERCs June 2001 price mitigation plan. The complainants request the FERC to set just and reasonable contract rates and to promptly set a refund effective date. In September 2002, the FERC issued an order in the Sacramento matter setting forth, in part, that the matter be set for an evidentiary hearing to be held in abeyance until the parties engage in settlement negotiations and that a refund effective date of September 22, 2002 be established. DETM participated in settlement proceedings and reached a settlement with the SMUD in February 2003. In February 2003, the SMUD filed to withdraw its FERC complaint against DETM. On March 10, 2003, the FERC issued an order in the Burbank matter setting forth, in part, that the matter be set for an evidentiary hearing to be held in abeyance until the parties engage in settlement negotiations, and that a refund effective date of October 11, 2002 be established. Colorado River Commission of Nevada (CRCN) /Pioneer Companies (Pioneer). The State of Nevada, through the CRCN, filed an interpleader complaint in federal court in Nevada on July 9, 2002, against Pioneer and 13 vendors, including DETM, who entered into power transactions with the CRCN between January 1998 and the filing date of the suit. The CRCN alleges that it purchased power on behalf of Pioneer but that Pioneer has disavowed its contractual liability to pay for certain of those power transactions. The CRCN asserts that DETM and the other vendors may have claims for the value of their contracts with the CRCN in excess of $100 million. The CRCN asks the court to assess the competing claims of the parties and distribute the assets which it seeks to deposit into the registry of the court (cash assets of approximately $35 million allegedly held for Pioneers behalf as well as the value of electric power delivered or to be delivered on Pioneers behalf) and issue other appropriate orders to resolve the claims while prohibiting the institution or prosecution of other proceedings affecting the claims at issue. DETM and certain other parties have filed motions to dismiss the complaint on various grounds. In February 2003, the court granted the motions of DETM and other interpleader defendants by dismissing the interpleader complaint in its entirety for lack of subject matter jurisdiction. The Western Power Disputes are in their early stages. Duke Energy continues to evaluate the facts and asserted claims in the Western Power Disputes and intends to vigorously defend itself. ExxonMobil Corporation Arbitration. In 2000, three Duke Energy subsidiaries initiated binding arbitration against three Exxon Mobil Corporation subsidiaries (the ExxonMobil entities) concerning the parties joint ownership of DETM and related affiliates (the Ventures). At issue was a buy-out right provision under the joint venture agreements for these entities. If there is a material business dispute between the parties, which Duke Energy alleged had occurred, the buy-out provision gives Duke Energy the right to purchase Exxon Mobils 40% interest in DETM. Exxon Mobil does not have a similar right under the joint venture agreements and once Duke Energy exercises the buy-out right, each party has the right to unwind the buy-out under certain specific circumstances. In December 2000, Duke Energy exercised its right to buy the Exxon Mobil entities interest in the Ventures. Duke Energy claimed that refusal by the Exxon Mobil entities to honor the exercise was a breach of the buy-out right provision, and sought specific performance of the provision. Duke Energy also made additional claims against the Exxon Mobil entities for breach of the agreements governing the Ventures. Exxon Mobil also asserted breach of contract claims against Duke Energy. In December 2002, an arbitration panel issued a binding ruling against Exxon Mobil on its claims against Duke Energy and granted Duke Energy favorable declaratory relief. Duke Energy has terminated the previously exercised buy-out provision. Trading Matters. Since April 2002, 17 shareholder class-action lawsuits have been filed against Duke Energy: 13 in the United States District Court for the Southern District of New York and four in the United States District Court for the Western District of North Carolina. The 13 lawsuits pending in New York were consolidated into one action and included as co-defendants Duke Energy executives and two investment banking firms. In December 2002, the New York court granted in all respects the defendants motion to dismiss the plaintiffs claims. The four lawsuits pending in North Carolina name as co-defendants Duke Energy executives. Two of the four North Carolina suits have been consolidated and involve claims under the Employee Retirement Income and Security Act relating to Duke Energys Retirement Savings Plan. This consolidated action names Duke Energy board members as co-defendants. In addition, Duke Energy has received three shareholder derivative notices demanding that it commence litigation against named executives and directors of Duke Energy for alleged breaches of fiduciary duties and insider trading. Duke Energys response to the derivative demands is not required until 90 days after receipt of written notice requesting a response. The class-action lawsuits and the threatened shareholder derivative claims arise out of allegations that Duke Energy improperly engaged in round trip trades which resulted in an alleged overstatement of revenues over a three-year period. The plaintiffs seek recovery of an unstated amount of compensatory damages, attorneys fees and costs for alleged violations of securities laws. In one of the lawsuits, the plaintiffs assert a common law fraud claim and seek, in addition to compensatory damages, disgorgement and punitive damages. Duke Energy intends to vigorously defend itself and its named executives and board members against these allegations. In 2002, Duke Energy responded to information requests and subpoenas from the FERC, the SEC, and the Commodity Futures Trading Commission (CFTC), and to grand jury subpoenas issued by the U.S. Attorneys office in Houston, Texas. All information requests and subpoenas seek documents and information related to trading activities, including so-called round-trip trading. Duke Energy received notice in mid-October that the SEC formalized its investigation regarding round-trip trading. Duke Energy is cooperating with the respective governmental agencies. Duke Energy submitted a final report to the SEC based on a review of approximately 750,000 trades made by various Duke Energy subsidiaries between January 1, 1999 and June 30, 2002. Outside counsel conducted an extensive review of trading, accounting and other records, with the assistance of Duke Energy senior legal, corporate risk management and accounting personnel. Duke Energy identified 28 round-trip transactions done for the apparent purpose of increasing volumes on the Intercontinental Exchange and 61 round-trip transactions done at the direction of one of Duke Energys traders that did not have a legitimate business purpose and were contrary to corporate policy. As a result of the trading review, Duke Energy has taken appropriate disciplinary action and put in place additional risk management procedures to improve and strengthen the oversight and controls of its trading operations. Duke Energy has also reconfirmed to employees that engaging in simultaneous or prearranged transactions that lack a legitimate business purpose, or any trading activities that lack a legitimate business purpose, is against company policy. As a result of Duke Energys findings in the course of its investigation related to the SEC inquiry on round-trip trades, DENA identified accounting issues that justified adjustments which reduced its operating income by $11 million during 2002. An additional $2 million charge was recorded in other Duke Energy business segments related to these findings. Duke Energy completed its analysis of such round-trip trades in 2002. In October 2002, the FERC issued a data request to the Largest North American Gas Marketers, As Measured by 2001 Physical Sales Volumes (Bcf/d), including DETM. In general, the data request asks for information concerning natural gas price data that was submitted by the gas marketers to entities that publish natural gas price indices. DETM responded to the FERCs data request and is also responding to requests that the CFTC has made for similar information. Management is unable to predict what, if any, action the FERC and the CFTC will take with respect to these matters. Sonatrach. Duke Energy LNG Sales, Inc. (Duke LNG) initiated arbitration proceedings against Sonatrach, the Algerian state-owned energy company, alleging that Sonatrach had breached its obligations by its failure to provide shipping under certain LNG Purchase and Transportation Agreements (the Sonatrach Agreements) relating to Duke LNGs purchase of liquefied natural gas (LNG) from Algeria and its transportation by LNG tanker to Lake Charles, Louisiana. In response to Duke LNGs claims, Sonatrach, together with its LNG sales and marketing subsidiary, Sonatrading Amsterdam B.V. (Sonatrading), have claimed that Duke LNG repudiated the Sonatrach Agreements as a result of, among other things, Duke LNGs alleged failure to diligently seek commitments from customers, and to submit offers to Sonatrading based on such commitments, for the purchase of LNG from Sonatrading. By virtue of Duke LNGs alleged breaches, Sonatrach and Sonatrading seek to terminate the Sonatrach Agreements and to recover damages from Duke LNG. The final evidentiary hearing in the liability phase of this arbitration was concluded in January 2003 in London. Briefing and oral argument on this phase will be completed in March 2003, and a ruling from the panel on issues of liability is expected by late summer 2003. The damages phase for this proceeding will be scheduled following the panels liability ruling. Management believes that the final disposition of the Sonatrach proceedings will have no material adverse effect on the consolidated results of operations, cash flows or financial position. Enron Bankruptcy. In December 2001, Enron filed for relief pursuant to Chapter 11 of the United States Bankruptcy Code in the U.S. Bankruptcy Court for the Southern District of New York. Additional affiliates have filed for bankruptcy since that date. Certain affiliates of Duke Energy engaged in transactions with various Enron entities prior to the bankruptcy filings. DETM was a member of the Official Committee of Unsecured Creditors in the bankruptcy cases which are being jointly administered, but as of February 2003, DETM resigned from the Official Committee of Unsecured Creditors in the Enron bankruptcy case. Duke Energy has taken a reserve to offset its exposure to Enron. In mid-November 2002, various Enron trading entities demanded payment from DETM and DEM for certain energy commodity sales transactions without regard to the set off rights of DETM and DEM and demanded that DETM detail balances due under certain master trading agreements without regard to the set-off rights of DETM. On December 13, 2002, DETM and DEM filed an adversary proceeding against Enron, seeking, among other things, a declaration affirming each plaintiffs right to set off its respective debts to Enron. The complaint alleges that the Enron affiliates were operated by Enron as its alter ego and as components of a single trading enterprise and that DETM and DEM should be permitted to exercise their respective rights of mutual set-off against the Enron trading enterprise under the Bankruptcy Code. The complaint also seeks the imposition of a constructive trust so that any claims by Enron against DETM or DEM are subject to the respective set off rights of DETM and DEM. Enron has filed a motion to dismiss, asserting that DETM and DEM are not entitled to the requested relief. Management believes that the final disposition of the Enron bankruptcy will have no material adverse effect on the consolidated results of operations, cash flows or financial position. Injuries and Damages Claims. Duke Energy has experienced numerous claims relating to damages for personal injuries alleged to have arisen from the exposure to or use of asbestos in connection with construction and maintenance activities conducted by Duke Energy on its electric generation plants during the 1960s and 1970s. During 1999, Duke Energy experienced a significant increase in the number of these claims. This increase, coupled with its cumulative experience in claims received, prompted Duke Energy to conduct a comprehensive review which was completed in late 1999 and to record an $800 million accrual, to reflect the purchase of a third-party insurance policy as well as estimated amounts for future claims not recoverable under such policy. The insurance policy, combined with amounts covered by self-insurance reserves, provides for claims paid up to an aggregate of $1.6 billion. Duke Energy currently believes the estimated claims relating to this exposure will not exceed such amount. While Duke Energy is uncertain as to the timing of when claims will be received, portions of the estimated claims may not be received and paid for 30 or more years. While Duke Energy has recorded an accrual related to this estimated liability, such estimates cannot be made with certainty. Factors, such as the frequency and magnitude of claims, could result in changes in the estimates of the injuries and damages liability and insurance recoveries. Such changes could result in, over time, a difference from the amount currently reflected in the consolidated financial statements. However, due to Duke Energys insurance program relating to this liability, management believes that any changes in the estimates would not have a material adverse effect on consolidated results of operations, cash flows or financial position. Other Litigation and Legal Proceedings. Duke Energy and its subsidiaries are involved in other legal, tax and regulatory proceedings before various courts, regulatory commissions and governmental agencies regarding performance, contracts, royalty disputes, mismeasurement and mispayment claims (some of which are brought as class actions), and other matters arising in the ordinary course of business, some of which involve substantial amounts. Management believes that the final disposition of these proceedings will have no material adverse effect on consolidated results of operations, cash flows or financial position. Other Commitments and Contingencies As part of its normal business, Duke Energy is a party to various financial guarantees, performance guarantees and other contractual commitments to extend guarantees of credit and other assistance to various subsidiaries, investees and other third parties. These arrangements are largely entered into by Duke Capital Corporation. To varying degrees, these guarantees involve elements of performance and credit risk, which are not included on the Consolidated Balance Sheets. The possibility of Duke Energy or Duke Capital Corporation having to honor its contingencies is largely dependent upon future operations of various subsidiaries, investees and other third parties, or the occurrence of certain future events. Duke Energy would record a reserve if events occurred that required that one be established. (See Note 17.) In addition, Duke Energy enters into various fixed-price, non-cancelable commitments to purchase or sell power (tolling arrangements or power purchase contracts), take-or-pay arrangements, transportation or throughput agreements and other contracts that may or may not be recognized on the Consolidated Balance Sheets. Some of these arrangements may be recognized at market value on the Consolidated Balance Sheets as trading contracts or qualifying hedge positions included in Unrealized Gains or Losses on Mark-to-Market and Hedging Transactions. The following table summarizes Duke Energys contractual cash obligations for the items listed below for each of the years presented.
Leases Duke Energy leases assets in several areas of its operations. Consolidated rental expense for operating leases was $133 million in 2002, $114 million in 2001 and $90 million in 2000. Future minimum rental payments under operating leases consisted of the following as of December 31, 2002:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ©Copyright 2003 Duke Energy Corporation |