Duke Energy


> Introduction
> Results of Operations
> Liquidity and Capital Resources
> Quantitative and Qualitative Disclosures about Market Risk
> Current Issues


CURRENT ISSUES

-ELECTRIC COMPETITION Wholesale Competition
The Energy Policy Act of 1992 (EPACT) and the FERC's subsequent rulemaking activities have established the regulatory framework to open the wholesale energy market to competition. EPACT amended provisions of the Public Utility Holding Company Act of 1935 and the Federal Power Act to remove certain barriers to a competitive wholesale market. EPACT permits utilities to participate in the development of independent electric generating plants for sales to wholesale customers, and also permits the FERC to order transmission access for third parties to transmission facilities owned by another entity. It does not, however, permit the FERC to issue an order requiring transmission access to retail customers. The FERC, responsible in large measure for implementation of EPACT, has moved vigorously to implement its mandate, interpreting the statute broadly and issuing orders for third-party transmission service and a number of rules of general applicability, including Orders 888 and 889.

Open-access transmission for wholesale customers as defined by the FERC's final rules provides energy suppliers, including Duke Energy, with opportunities to sell and deliver capacity and energy at market-based prices. Duke Energy and several of its non-regulated subsidiaries have been granted authority by the FERC to act as power marketers. Electric Operations obtained from the FERC open-access rule the rights to sell capacity and energy at market-based rates from its own assets. Open access provides another supply option through which Electric Operations can purchase at attractive rates a portion of capacity and energy requirements resulting in lower overall costs to customers. Open access also provides Electric Operations' existing wholesale customers with competitive opportunities to seek other suppliers for their capacity and energy requirements.

On December 20, 1999, the FERC issued its Order No. 2000 regarding Regional Transmission Organizations (RTOs). In its order, the FERC stressed the voluntary nature of RTO participation by utilities and sets minimum characteristics and functions that must be met by utilities that participate in an RTO. The order provides for an open, flexible structure for RTOs to meet the needs of the market, and provides for the possibility of incentive ratemaking and other benefits for utilities that participate in an RTO.

The characteristics for acceptable RTOs include independence from market participants, operational control over a region of sufficient scope to support efficient and nondiscriminatory markets, and exclusive authority to maintain short-term reliability. The order requires each utility subject to the jurisdiction of the FERC and not already in a FERC-approved RTO to make a filing by October 15, 2000, that either proposes participation in an RTO that will be in operation no later than December 15, 2001, or provides a status report on the utility's progress towards participation in an RTO.

Because Order No. 2000 has just been issued, and may be revised in certain respects, management cannot estimate its effect on future consolidated results of operations or financial position.

Retail Competition
Currently, Electric Operations operates as a vertically integrated, investor-owned utility with exclusive rights to supply electricity in a franchised service territory – a 20,000-square-mile service territory in the Carolinas. In its retail business, the NCUC and the PSCSC regulate Electric Operations' service and rates.

Electric industry restructuring is being addressed in all 50 states and in the District of Columbia. These restructurings will likely impact all entities owning electric generating assets. The NCUC and the PSCSC are studying the merits of restructuring the electric utility industry in the Carolinas. During 1999, three electric utility restructuring bills were filed in South Carolina's House of Representatives. All three bills would introduce competition while allowing utilities to recover stranded costs, and have transition and phase-in periods ranging from five to six years. A task force formed by the South Carolina Senate is also examining issues related to deregulation of the state's electric utility business. This task force will prepare a report for review, discussion and possible legislative action by the state's Senate Judiciary Committee and General Assembly as a whole.

In May 1997, North Carolina passed a bill that established a study commission to examine whether competition should be implemented in the state. Members of this commission include legislators, customers, utilities and a member of an environmental group. The study commission expects to issue its report to the General Assembly in 2000.

One of the significant issues the study commission must address is the approximately $6 billion of debt issued by the two North Carolina municipal agencies (North Carolina Municipal Power Agency Number 1 and the North Carolina Eastern Municipal Agency). This debt is related to their joint ownership of generation assets with Duke Energy and Carolina Power & Light (CP&L). The municipal power agencies' member municipalities currently have electric rates higher than either Duke Energy or CP&L and are facing significant rate increases in the future to service the debt. As a result, the power agencies' debt and electric rates are economic development issues for the 51 power agency municipalities and, by extension, for the state as a whole.

On October 26 and 27, 1999, at the request of the study commission, four proposals were submitted to resolve the municipal debt issue, one of which was a joint Duke Energy-CP&L proposal. The study commission expects to include a recommendation to resolve the municipal debt issue in its report to the General Assembly in 2000.

More than a dozen bills on electric restructuring have been introduced in the last session of Congress. On October 27, 1999 the U.S. House Commerce Subcommittee on Energy and Power voted to move H.R. 2944, "The Electricity Competition and Reliability Act," to the full Commerce Committee. The primary restructuring issues addressed include repeal of major provisions of the Public Utility Holding Company Act and the Public Utility Regulatory Policies Act, reliability, transmission, nuclear decommissioning and state authority.

Currently, the electric utility industry is predominantly regulated on a basis designed to recover the cost of providing electric power to customers. If cost-based regulation were to be discontinued in the industry for any reason, including competitive pressure on the cost-based prices of electricity, profits could be reduced and electric utilities might be required to reduce their asset balances to reflect a market basis less than cost. Discontinuance of cost-based regulation would also require affected utilities to write off their associated regulatory assets. Duke Energy's regulatory assets are included in the Consolidated Balance Sheets. The portion of these regulatory assets related to Electric Operations is approximately $1.4 billion, including primarily purchased capacity costs, debt expense and deferred taxes related to regulatory assets. Duke Energy is recovering substantially all of these regulatory assets through its current wholesale and retail electric rates and would attempt to continue to recover these assets during a transition to competition. In addition, Duke Energy would seek to recover the costs of its electric generating facilities in excess of the market price of power at the time of transition.

Duke Energy supports a properly managed and orderly transition to competitive generation and retail services in the electric industry. However, transforming the current regulated industry into efficient, competitive generation and retail electric markets is a complex undertaking, which will require a carefully considered transition to a restructured electric industry. The key to effective retail competition is fairness among customers, service providers and investors. Duke Energy intends to continue to work with customers, legislators and regulators to address all the important issues. Management currently cannot predict the impact, if any, of these competitive forces on future consolidated results of operations or financial position.

-NATURAL GAS COMPETITION Wholesale Competition
On July 29, 1998, the FERC issued a Notice of Proposed Rulemaking (NOPR) on short-term natural gas transportation services, which proposed an integrated package of revisions to its regulations governing interstate natural gas pipelines. "Short term" has been defined in the NOPR as all transactions of less than one year. Under the proposed approach, cost-based regulation would be eliminated for short-term transportation and replaced by regulatory policies intended to maximize competition in the short-term transportation market, mitigate the ability of companies to exercise residual monopoly power and provide opportunities for greater flexibility in providing pipeline services. The proposed changes include initiatives to revise pipeline scheduling procedures, receipt and delivery point policies and penalty policies, and require pipelines to auction short-term capacity. Other proposed changes would improve the FERC's reporting requirements, permit pipelines to negotiate rates and terms of services, and revise certain rate and certificate policies that affect competition.

In conjunction with the NOPR, the FERC also issued a Notice of Inquiry (NOI) on its pricing policies in the existing long-term market and pricing policies for new capacity. The FERC seeks comments on whether its policies are biased toward either short-term or long-term service, provide accurate price signals and the right incentives for pipelines to provide optimal transportation services and construct facilities that meet future demand and do not result in over building and excess capacity. Comments on the NOPR and NOI were due in April 1999. On September 15, 1999, the FERC issued a new policy statement on certifying new interstate capacity in response to comments filed on the certificate issues raised in the NOPR.

Because the ultimate resolution of these issues is unknown, management cannot estimate the effects of these matters on future consolidated results of operations or financial position.

Retail Competition
Changes in regulation to allow retail competition could affect Duke Energy's natural gas transportation contracts with local gas distribution companies. Natural gas retail deregulation is in the very early stages of development and management cannot estimate the effects of this matter on future consolidated results of operations or financial position.

-NUCLEAR DECOMMISSIONING
COSTS Duke Energy's estimated site-specific nuclear decommissioning costs total approximately $1.9 billion stated in 1999 dollars based on decommissioning studies completed in 1999. This estimate includes the cost of decommissioning plant components not subject to radioactive contamination. Duke Energy contributes to an external decommissioning trust fund and maintains an internal reserve to fund these costs.

The balance of the external funds as of December 31, 1999 and 1998 was $703 million and $580 million, respectively. The balance of the internal reserve as of December 31, 1999 and 1998 was $223 million and $217 million, respectively, and is reflected in the Consolidated Balance Sheets as Accumulated Depreciation and Amortization.

Both the NCUC and the PSCSC have granted Duke Energy recovery of estimated decommissioning costs through retail rates over the expected remaining service periods of its nuclear plants. Management believes that funding of the decommissioning costs will not have a material adverse effect on consolidated results of operations or financial position. See Note 11 to the Consolidated Financial Statements for additional information.

As of December 31, 1999 and 1998, the external decommissioning trust fund was invested primarily in domestic and international equity securities, fixed-rate, fixed-income securities and cash and cash equivalents. Maintaining a portfolio that includes long-term equity investments maximizes the returns to be utilized to fund nuclear decommissioning, which in the long-term will better correlate to inflationary increases in decommissioning costs. However, the equity securities included in Duke Energy's portfolio are exposed to price fluctuations in equity markets, and the fixedrate, fixed-income securities are exposed to changes in interest rates.

Duke Energy actively monitors its portfolio by benchmarking the performance of its investments against certain indexes and by maintaining, and periodically reviewing, established target allocation percentages of the assets in its trusts. Because the accounting for nuclear decommissioning recognizes that costs are recovered through the Electric Operations segment's rates, fluctuations in equity prices or interest rates do not affect consolidated results of operations.

-ENVIRONMENTAL
Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters.

Manufactured Gas Plants and Superfund Sites
Duke Energy was an operator of manufactured gas plants until the early 1950s and has entered into a cooperative effort with the State of North Carolina and other owners of certain former manufactured gas plant sites to investigate and, where necessary, remediate these contaminated sites. The State of South Carolina has expressed interest in entering into a similar arrangement. Duke Energy is considered by regulators to be a potentially responsible party and may be subject to future liability at seven federal Superfund sites and two state Superfund sites. While the cost of remediation of the remaining sites may be substantial, Duke Energy will share in any liability associated with remediation of contamination at such sites with other potentially responsible parties. Management believes that resolution of these matters will not have a material adverse effect on consolidated results of operations or financial position.

PCB (Polychlorinated Biphenyl) Assessment and Clean-up Programs In June 1999, the Environmental Protection Agency (EPA) certified that TETCO, a wholly owned subsidiary of Duke Energy, had completed clean up of PCB contaminated sites under conditions stipulated by a U.S. Consent Decree in 1989. TETCO is required to continue groundwater monitoring on a number of sites for at least the next two years. The estimated cost of such monitoring is not material.

Under terms of the agreement with CMS discussed in Note 2 to the Consolidated Financial Statements, Duke Energy is obligated to complete clean-up of previously identified contamination at certain agreed-upon sites on the PEPL and Trunkline systems. These clean-up programs are expected to continue until 2001. The contamination resulted from the past use of lubricants containing PCBs and the prior use of wastewater collection facilities and other on-site disposal areas. Soil and sediment testing, to date, has detected no significant off-site contamination. Duke Energy has communicated with the EPA and appropriate state regulatory agencies on these matters.

At December 31, 1999 and 1998, remaining estimated cleanup costs on the TETCO, PEPL and Trunkline systems were accrued and included in the Consolidated Balance Sheets as Other Current Liabilities and Environmental Clean-up Liabilities. These cost estimates represent gross clean-up costs expected to be incurred, have not been discounted or reduced by customer recoveries and generally do not include fines, penalties or third-party claims. Costs expected to be recovered from customers have been deferred and are included in the Consolidated Balance Sheets as Environmental Clean-up Costs.

The federal and state clean-up programs are not expected to interrupt or diminish Duke Energy's ability to deliver natural gas to customers. Based on Duke Energy's experience to date and costs incurred for clean-up operations, management believes the resolution of matters relating to the environmental issues discussed above will not have a material adverse effect on consolidated results of operations or financial position.

Air Quality Control
The Clean Air Act Amendments of 1990 require a two-phase reduction by electric utilities in aggregate annual emissions of sulfur dioxide and nitrogen oxide by 2000. Duke Energy currently meets all requirements of Phase I. Duke Energy supports the national objective of protecting air quality in the most cost-effective manner, and has already reduced emissions by operating plants efficiently, using nuclear and hydroelectric generation and implementing various compliance strategies. To meet Phase II requirements by 2000, Duke Energy's current strategy includes using low-sulfur coal, purchasing sulfur dioxide emission allowances and installing low-nitrogen oxide burners and emission monitoring equipment. Construction activities needed to comply with Phase II requirements will be completed in the spring of 2000, allowing compliance with year 2000 Phase II requirements. Additional annual operating expenses of approximately $25 million for low-sulfur coal premiums, emission allowance purchases and other compliance activities will occur after 2000. This strategy is contingent upon developments in future markets for emission allowances, low-sulfur coal, future regulatory and legislative actions and advances in clean air technologies.

In October 1998, the EPA issued a final ruling on regional ozone control which requires revised State Implementation Plans for 22 eastern states and the District of Columbia. This EPA ruling is being challenged in court by various states, industry and other interests, including the states of North Carolina and South Carolina and Duke Energy. In May 1999, the court ordered that no state need submit a plan "pending further order of the court." The EPA has undertaken other ozone-related actions having virtually identical goals. These actions have likewise been challenged by the same or similar parties. The resolution of the October 1998 action is expected to resolve these other ozone-related actions as well. The North Carolina Environmental Management Commission is considering several competing proposals to reduce utility emissions of nitrogen oxide. A proposed rule is anticipated in March 2000 with a final rule in September 2000. Depending on the resolution of these matters, costs to Duke Energy may range from approximately $100 million to $600 million for additional capital improvements.

In October 1999, the EPA sent Duke Energy a request seeking information on Duke Power's repair and maintenance of its coal-fired plants since 1978. This is part of the EPA's New Source Reviews (NSR) enforcement initiative, in which the EPA claims that utilities and others have committed widespread violations of the Clean Air Act permitting requirements for the past quarter century. In November 1999, the EPA filed suit against seven utilities and issued an administrative order to Tennessee Valley Authority alleging numerous NSR permitting violations. The EPA's allegations run counter to previous EPA guidance regarding the applicability of the NSR permitting requirements. Duke Power, along with several other utilities, has routinely undertaken the type of repair, replacement, and maintenance projects that the EPA now claims are illegal. A suit has not been instituted against Duke Energy, and while it is too early to predict any consequences, Duke Energy believes that all of its electric generation units are properly permitted and have been properly maintained. Because this matter is in its most preliminary stage with respect to Duke Energy, management cannot estimate the effects of these matters on future consolidated results of operations or financial position.

In December 1997, the United Nations held negotiations in Kyoto, Japan to determine how to minimize global warming caused by, among other things, carbon dioxide emissions from fossil-fired generating facilities and methane from natural gas operations. Further negotiations in November 1998 resulted in a work plan to complete the operational details of the Kyoto agreement by late 2000. If this initiative is adopted in its current form, it could have far reaching implications to Duke Energy and the entire energy industry. Because this matter is in the early stages of discussion, management cannot estimate the effects on future consolidated results of operations or financial position.

-LITIGATION AND CONTINGENCIES
For information concerning litigation and other commitments and contingencies, see Note 14 to the Consolidated Financial Statements.

-YEAR 2000 READINESS PROGRAM
Duke Energy did not experience any disruption to its operations resulting from the transition to the year 2000. Duke Energy completed its year 2000 readiness program at all of its business units in November 1999. Systems will continue to be monitored throughout the year, with special attention given to the leap year transition. The total cost of the program, including internal labor as well as incremental costs such as consulting and contract costs, was approximately $58 million. These costs exclude replacement systems that, in addition to being Year 2000 ready, provided significantly enhanced capabilities which benefit operations in future periods.

-NEW ACCOUNTING STANDARD
In September 1998, Statements of Financial Accounting Standard (SFAS) No. 133, "Accounting for Derivative Instruments and Hedging Activities," was issued. Duke Energy is required to adopt this standard by January 1, 2001. SFAS No. 133 requires that all derivatives be recognized as either assets or liabilities and measured at fair value, and it defines the accounting for changes in the fair value of the derivatives depending on the intended use of the derivative. Duke Energy is currently reviewing the expected impact of SFAS No. 133 on consolidated results of operations and financial position.

-SUBSEQUENT EVENTS
On December 16, 1999, Duke Energy announced that it had signed definitive agreements to combine Duke Energy's gas gathering and processing businesses with Phillips Petroleum's Gas Processing and Marketing unit to form a new midstream company. Under the terms of the agreements, the new company will seek to arrange approximately $2.6 billion of debt financing and, upon closing of the transaction, will make a one-time cash distribution of $1.2 billion to both Duke Energy and Phillips Petroleum. At closing, Duke Energy will own about 70% of the new company and Phillips Petroleum will own about 30%. The new company would then offer approximately 20% of its equity to the public in 2000 to reduce the debt resulting from the transaction. Such an offering is conditional upon completion of the transaction and favorable market conditions.

On January 4, 2000, Duke Energy announced that it had entered into a definitive agreement to purchase, for $386 million, 100% of the stock of El Paso Energy Corporation's wholly owned subsidiary, East Tennessee Natural Gas Company, a 1,100-mile pipeline that crosses Duke Energy's TETCO pipeline and serves the southeastern region of the U. S.

Both transactions are subject to regulatory approval and are expected to close in the first quarter of 2000.

In January 2000, Duke Energy completed a tender offer to the minority shareholders of Paranapanema and successfully acquired an additional 51% economic interest in the company for approximately $280 million. This increased Duke Energy's economic ownership from approximately 44% to approximately 95%.

-FORWARD-LOOKING STATEMENTS
From time to time, Duke Energy's reports, filings and other public announcements may include assumptions, projections, expectations, intentions or beliefs about future events. These statements are intended as "forward-looking statements" under the Private Securities Litigation Reform Act of 1995. Duke Energy cautions that assumptions, projections, expectations, intentions or beliefs about future events may and often do vary from actual results and the differences between assumptions, projections, expectations, intentions or beliefs and actual results can be material. Accordingly, there can be no assurance that actual results will not differ materially from those expressed or implied by the forward-looking statements. Some of the factors that could cause actual achievements and events to differ materially from those expressed or implied in such forward-looking statements include state, federal and foreign legislative and regulatory initiatives that affect cost and investment recovery, have an impact on rate structures and affect the speed and degree to which competition enters the electric and natural gas industries; industrial, commercial and residential growth in the service territories of Duke Energy and its subsidiaries; the weather and other natural phenomena; the timing and extent of changes in commodity prices, interest rates and foreign currency exchange rates; changes in environmental and other laws and regulations to which Duke Energy and its subsidiaries are subject or other external factors over which Duke Energy has no control; the results of financing efforts, including Duke Energy's ability to obtain financing on favorable terms, which can be affected by Duke Energy's credit rating and general economic conditions; growth in opportunities for Duke Energy's business units; and the effect of accounting policies issued periodically by accounting standard-setting bodies.